home *** CD-ROM | disk | FTP | other *** search
/ A.C.E. 1 / ACE CD 1.iso / files / games / 1-l / fireforc.lha / FireForceCDウイ / BRIDGE.FNL < prev    next >
Encoding:
Text File  |  1993-11-27  |  482 b   |  11 lines

  1. @        Due  to  continued  bombing  of  the  main
  2. bridges across the river, the guerilla forces have
  3. built a makeshift bridge across the river at DELTA
  4. 17.  Intelligence  reports  that  this  bridge  is
  5. taking  an  increasingly  large  number  of  enemy
  6. convoys, therefore Command  has  decided that this
  7. bridge  must   be   demolished.   Engineers   have
  8. determined that the  bridge  may  be demolished by
  9. placing  charges  at  strategic   points  on  it's
  10. structure.
  11.